The recently completed Ark Academy located in Wembley, London is a mixed, non-denominational, all-through academy, the academy takes pupils from age 3 to 18 and has specialist status in mathematics and citizenship. The academy is part of the ARK Schools, ARK Schools are a UK education charity, it is also part of the international children’s charity ARK. The charity runs a range of health, welfare and education projects in the UK, Southern Africa, India and Eastern Europe.

Requirement

ITSL Group were engaged at the request of the new Head Teacher Delia Smith having used ITSL’s services in a previous school. The remit was to produce an integrated hall system to enable the control of the stage mounted projection equipment and the equipment including the lighting control on the 1st floor production booth.
The installation was to be designed to utilise as much of the existing equipment already purchased by the academy but repackaged and delivered by ITSL, as with all organisation there were strict guidelines in regard to equipment specification, colour schemes and branding.

Solution

ITSL Group designed a lectern based system utilising dual Crestron touch panels, both identical with one positioned on the stage lectern and one within the 1st floor production booth. This solution gave complete control to the speaker on the stage or the booth staff to control the video input to the projector, projector screen audio volume and lighting scenes. The entire system can be controlled from the lectern and is all communicated to the booth over CAT5, the control panel is a POE device and video and audio is transmitted over twisted pair transmitters offering an very simple colour coded cable interface to allow the lecterns removal if required.
Using a combination of Crestron and Kramer products ITSL provided an excellent integrated system that can be used by all within the academy regardless of technical skill level.

Equipment

 

  • 2 x Crestron TPMC-4SM Touch Panel
  • 1 x Crestron MC2E AV Processor
  • 3 x Furman Power Conditioner
  • 2 x Crestron DIN-SW8 AC Switcher
  • 1 x Kramer VP-23DS Presentation Switch

 

 

  • 1 x Denon DVD Player
  • Various Kramer – Twisted Pair Tx/Rx
  • 1 x Symetrix DSP
  • 1 x ExOr Lighting Controller
  • 1 x ITSL Custom AV Lectern and Rack

 

How will ITSL work with you?

We at ITSL believe in simple, time-tested and robust working principles. The way we work with clients is simple and straightforward. Our projects are divided into 4 main stages.

Consultancy

This is the initial stage of every AV project. Here our aim is to meet our clients and talk about their needs and the final results they want to achieve.

Design

During this stage, our experts will design the solution for our clients and present it to them in a clear and easy to understand manner.

Supply

Once the design is approved ITSL will take care of contacting suppliers and ensure that every piece of hardware is ready for the project at the most cost efficient price.

 Installation

Installation is when everything starts coming together. Our qualified engineers will work on-site with you to ensure that everything is to spec.

Commissioning

Before the launch of an AV solution, we run extensive QA to ensure that everything works as intended.

Training

After we’ve finalised the AV project and the hardware is ready to go live we will take care of training all of the staff that will operate it.

 Maintenance

AV hardware runs best when it’s properly maintained. ITSL will provide scheduled maintenance on both the hardware and the software.

 Support

Even after the work has been completed our clients can still rely on ITSL to take care of any problems on the equipment whenever the need arises.